The short answer
There is no single reliable timeframe for every website. Storm describes most projects as launching in weeks rather than months, with a delivery plan agreed before starting. That is not a guaranteed completion date: page count, content readiness, feedback, integrations and migration work determine the schedule.
When comparing proposals, ask what the clock starts from and what must be ready before it starts. A build estimate beginning after approved content is supplied is not the same as an end-to-end estimate that includes writing and photography.
The stages a realistic plan should include
| Stage | What needs to be agreed or completed |
|---|---|
| Discovery and scope | Business goals, page list, visitor journeys, responsibilities and connected tools |
| Content and assets | Approved copy, brand assets, photography and any required permissions |
| Design and approval | Page direction, mobile layouts and consolidated feedback |
| Build and integrations | Working pages, forms, connected services and editing arrangements |
| Testing and migration | Device checks, enquiry delivery, redirects and domain/email checks |
| Launch and handover | Release approval, access, documentation and support arrangements |
What changes the schedule?
More pages can mean more writing, review and testing, but complexity matters as much as quantity. Five pages with a secure portal or a complicated booking connection may need more work than a larger straightforward site. Ask the agency to explain its dependencies rather than pricing time by page count alone.
- Missing or unapproved copy and imagery.
- Several stakeholders providing conflicting feedback.
- External services with access or integration requirements.
- Changes to the agreed scope after design approval.
- An existing site with important URLs, downloads or content to migrate.
How to keep the project moving
Choose one decision-maker to collect feedback. Agree what counts as approval and when feedback is due. Provide existing brand files, approved claims and a content owner early. Share access only through an agreed secure process, not a contact form or an unprotected document.
Put scope changes into writing. Ask what each change does to cost and timing before approving it. A smaller, well-defined first release can be sensible, provided important services, accessibility, privacy and working enquiry journeys are not treated as optional finishing touches.
Do not save time by skipping launch checks
Open the site on a phone and a desktop. Follow the key journey, submit a real test enquiry and confirm it reaches the responsible person. Check error states as well as success messages. A form that looks finished is not evidence that messages are delivered.
For a replacement website, review old URLs and map changed pages to relevant new destinations. Google's site-move guidance explains URL mapping and permanent redirects. Check the domain, email service and existing search tools before the change; a fast launch that breaks them is not a useful result.
What should Storm's proposal tell you?
Storm websites start from £2,500 for a small, focused site; every other project is priced on its scope, complexity and the quality it needs, agreed before work starts. A proposal should then confirm your particular deliverables, content responsibilities, feedback stages and delivery plan. Package prices do not establish a universal turnaround time.
Our questions to ask a web design agency guide gives you a practical comparison checklist. Ask for the milestones and dependencies in writing, not just a confident launch date.
Common questions
Can a website be built in two weeks?
A tightly scoped project with ready content may be possible, but two weeks is not a safe general promise. Ask what is included, what has already been completed and which checks remain. An individual client's experience does not guarantee the same timing for another project.
Does a new website rank as soon as it launches?
Launch and search performance are separate. Search engines need to discover and evaluate pages, and visibility depends on competition and other factors. SEO-ready foundations do not mean immediate rankings.
What is the easiest first step?
Start with a free 24-hour audit of your current website. George or Nicholas can help identify whether you need targeted changes or a broader website design project before you plan a launch.
Want this applied to your website?
George or Nicholas will record a personal walkthrough of your site within 24 hours.
Not ready for an audit? See Websites that convert.
